top mounted bus A/C air condition
For city bus and coach.
Model | PF-01 | PF-03 | PF-04 | PF-05 | PF-06 | PF-07 |
Vehicle Length | 6-8m | 7-9m | 8-10m | 9-11m | 11-13m | 12-14m |
Cooling Capacity(kcal/h) | 18000 | 22000 | 24000 | 28000 | 32000 | 38000 |
Evaporator Airflow(m³/h) | 4000 | 4000 | 4000 | 6000 | 7000 | 8000 |
Compressor Displacement(CC) | 310 | 400 | 550 | 550 | 650 | 750 |
Size(mm) LxWxH | 3038*1820*195 | 3335*1820*195 | 3335*1820*195 | 3804*1902*195 | 4435*1902*195 | 5515*1902*195 |
Note:
1. Compressor Brand: VALEO,BITZER OR BOCK
2. Fan&Blower Option: Brush or Brushless, Local or International Brand
3. Condenser Coil Option: Micro ChanneL, Copper Tube and Aluminium Fins
4. Double Compressors Optional
Preparation
First clean the rooftop surface, then put glue to install the sponge and rubber pad, later put glue with a glue gun around the sponge.
Evaporator and Condensor Installation
Lift the condensor and evaporator to the top of the bus, install and connect the pipes and wiring harness, then fix the condesor and evaporator to the bus rooftop, put glue for sealants where needed.
Cover Installation
Move the cover to the top of condensor and evaporator, check the position and drop the cover, fix screws and check the gap to follow requirement.
Why choose us
A: Low price because of constantly optimized purchasing sources
B: One-stop-shop, meanwhile you can purchase all your interested Chinese brand parts, accessories and other fast moving parts
C: Certificates for customs clearance can be handled by us
Our service
We supply bus body parts in CKD/SKD kit and can open mould for special product.
We also supply technical support to training your worker to assembly bus in your factory.
Packing details
We use all kinds of packing in accordance with specific parts, in carton, pallet, wooden case etc.
FAQ
Q1: How to choose right spare parts ?
A1: Check the Vehicle nameplate, try to find the VIN, or find the part code from the parts surface. Meanwhile, try to send us sample picture with size, then we will give quick reply after confirmation.
Q2: What's your delivery time?
A2: It depends on the purchase quantity and time. Normally it will takes 7-15 days for delivery. If need urgently, you can choose transport by air or express.
Q3: What's your Price terms and payment terms ?
A3: We can accept EXW,FOB, FCR,CIF, and DDP etc. and T/T in advance, L/C at sight, western union and in cash.
Q4: How to guarantee parts quality and quantity?
A4: We have a strict admittance policy on our supply Chain. The factory have high quality authentication who can come into our supply system.